Run flat-out and small surprises turn into big delays. The fix is leaving room — not going faster.
No signed scope sheet, no start. Every change after gets its cost — in hours and days — written down before we say yes.
Cramming one more job in makes everything late. A later honest date beats a missed one.
Book it against the calendar. If the month's taken, it moves — it doesn't double up.
Most of every exhibit is parts we've built before. Design them once — then assemble, don't reinvent.
Fewer jobs open at once means every one finishes sooner. A sold job waits its turn.
An hour saved in finishing is real output. An hour saved anywhere else mostly isn't.
The room we keep open absorbs the surprises. A shop that runs at 100% never catches up.